
Water Treatment Systems
Raw Water Pumping Stations and Dams (RWPS):
-
Ÿ Construction and installation of sluice gates in Sabana Dam, Las Piedras, PR.
-
Ÿ Construction and installation of raw water baffles in Guayanes Dam, Yabucoa, PR.
-
Ÿ Demolition of a 2.5MW hydroelectric generators at Carraizo Dam, Trujillo Alto, PR.
Potable Water Pumping Stations (PWPS):
-
Ÿ Construction of a 20HP duplex horizontal PWPS, 6kms of 6” PVC SDR-14 distribution pipelines in La Casa Ward, Yabucoa, PR.
-
Ÿ Construction of a 50HP duplex horizontal PWPS, 2.5kms of 6” PVC SDR-14 distribution pipelines in Playita Ward, Yabucoa, PR.
Potable Water Distribution Tanks (PWDT):
-
Ÿ Rehabilitation of a 1MG PWDT in Juan Martin Ward, Luquillo, PR.
-
Ÿ Rehabilitation of a 1MG, 3MG and 5MG urban PWDT in Humacao, PR.
Potable Water Pipelines (PWPL):
-
Ÿ Installation of 2,000 meters of 4” PVC SDR-14 and 164 service connection in Barriada Vietnam, Guaynabo, PR.
-
Ÿ Installation of 3,000 meters of 6” DI Class 250 and 60 service connection in El Trompo and Mamey, Loiza, PR.
Potable Water Treatment Plants (PWTP):
-
Ÿ Maintenance of 4 filters and replacement of filter media in Luquillo PWTP, a 2.5MGD plant.
-
Ÿ Construction of flow diversion to new section of the plant in a Sergio Cuevas PWTP, Trujillo Alto, PR. A 110MGD capacity plant.
​
Note: These are only some of our completed projects within this field of work; for inquiries on our complete project portfolio please contact us using the contact information in the website.



