top of page

Water Treatment Systems

Raw Water Pumping Stations and Dams (RWPS):

  • Ÿ Construction and installation of sluice gates in Sabana Dam, Las Piedras, PR.

  • Ÿ Construction and installation of raw water baffles in Guayanes Dam, Yabucoa, PR.

  • Ÿ Demolition of a 2.5MW hydroelectric generators at Carraizo Dam, Trujillo Alto, PR.

 

Potable Water Pumping Stations (PWPS):

  • Ÿ Construction of a 20HP duplex horizontal PWPS, 6kms of 6” PVC SDR-14 distribution pipelines in La Casa Ward, Yabucoa, PR.

  • Ÿ Construction of a 50HP duplex horizontal PWPS, 2.5kms of 6” PVC SDR-14 distribution pipelines in Playita Ward, Yabucoa, PR.

 

Potable Water Distribution Tanks (PWDT):

  • Ÿ Rehabilitation of a 1MG PWDT in Juan Martin Ward, Luquillo, PR.

  • Ÿ Rehabilitation of a 1MG, 3MG and 5MG urban PWDT in Humacao, PR.

 

Potable Water Pipelines (PWPL):

  • Ÿ Installation of 2,000 meters of 4” PVC SDR-14 and 164 service connection in Barriada Vietnam, Guaynabo, PR.

  • Ÿ Installation of 3,000 meters of 6” DI Class 250 and 60 service connection in El Trompo and Mamey, Loiza, PR.

 

Potable Water Treatment Plants (PWTP):

  • Ÿ Maintenance of 4 filters and replacement of filter media in Luquillo PWTP, a 2.5MGD plant.

  • Ÿ Construction of flow diversion to new section of the plant in a Sergio Cuevas PWTP, Trujillo Alto, PR.  A 110MGD capacity plant.

Note: These are only some of our completed projects within this field of work; for inquiries on our complete project portfolio please contact us using the contact information in the website. 

bottom of page